Loading...

RESALE

3Rooms
$19,488 NETT
NO GST
free gift

Choose either 1 of the below

Painting of WHOLE house Cooker Hood & Hob Upgrading of BLUM kitchen system
4Rooms
$20,888 NETT
NO GST
free gift

Choose either 1 of the below

Painting of WHOLE house Cooker Hood & Hob Upgrading of BLUM kitchen system
5Rooms
$21,588 NETT
NO GST
free gift

Choose either 1 of the below

Painting of WHOLE house Cooker Hood & Hob Upgrading of BLUM kitchen system

All packags includes supply & construct / install of:

PROFESSIONAL SERVICES:

Professional design consultation
Space planning proposal
Site coordination & supervision

DEMOLITION WORKS:

SUPPLY LABOUR & EQUIPMENT TO
Dismantle existing kitchen cabinet/concrete sink & stove support
Dismantle existing bathrooms & kitchen wall fittings
Dismantle existing bathrooms doors & door frames
Hacking off existing kitchen,master bathroom & common bathroom wall tiles
Hacking off existing wash area/3rd bathroom (executive mansionette apmt)
Hacking off existing floor tiles at kitchen,master & common bathroom
Hacking off existing floor tiles at wash area/3rd bathroom(executive mansionette apmt)

PLUMBING WORKS:

SUPPLY LABOUR , MATERIALS & EQUIPMENT TO
Installation of new single line stainless steel pipe (exclude hot water pipes) at kitchen and 2 bathrooms
Installation of 2 nos of toilet bowl
Installation of 2 nos of wash basin including tap
Supply and install of sink + tap for kitchen cabinet
Installation of storage/water heater (provide by owner)
Installation of bathroom accessories (provide by owner)
Installation of pvc outlet drainage pipes, basin & washing m/c

CARPENTRY WORKS:

(PRICES ARE SUBJECTED TO CHANGE AT FINAL DESIGN & MATERIAL STAGE)
SUPPLY MATERIALS,FABRICATE & INSTALL THE FOLLOWING ITEMS AS PER PROPOSED DRAWING IN SELECTED
LAMINATE FINISH
Kitchen cabinet 20 FT ( top & bottom ) with cutlery tray
Solid surface worktop 10 FT
Installation of stainless steel dishtray
Installation of selected built-in hood & hob

MISCELLANEOUS WORKS:

SUPPLY LABOUR,MATERIAL & EQUIPMENT TO
Installation of aluminium frame white powder coated bi-fold door at 2 bathrooms
Installation of frameless tempered glass shower screen with stainless steel hinges at master bedroom
Laying of corrugrated card boards for protection of floor after completion of flooring
Chemical and general cleaning including all window for whole house upon completion of renovation

Space Calibre Pte Ltd

31 Woodlands Close, #04-26 Woodlands Horizon, Singapore 737855
+65 8288 2027 (Colin Chong)
+65 6254 5791
Enquiry@SpaceCalibre.com.sg
Newsletter
Subscribe to get our latest offer